3000 PSI Standard Mix delivered in Neptune Beach, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
Neptune Beach is one of 4 Duval County communities we serve, home to about 7,000 people across ZIP codes 32233 and 32246.



3000 PSI Standard Mix in Neptune Beach — the quick facts
- Price
- typical $150–$220/yd³
- Prices reviewed
- September 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- sandy flatwoods with clay-enriched subsoil (Ultisols) in the uplands
- Best months
- October-June
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical Neptune Beach area range: $150–$220/yd³ delivered
A typical 2-yard pour ≈ $300–$440 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in Neptune Beach?
Typical Neptune Beach-area pricing for 3000 PSI Standard Mix runs $150–$220/yd³ delivered. We're expanding coverage in Neptune Beach — price your project and you're first in line.
When should I schedule a pour in Neptune Beach?
Longer pouring season than South Florida, with two caveats: summer storms (Jun-Sep) and occasional Dec-Feb freezes that call for curing blankets on overnight pours.
Which Neptune Beach ZIP codes do you deliver to?
In Neptune Beach we map ZIP codes 32233 and 32246. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.
What thickness should a 3000 PSI slab be?
Four inches is standard for patios, shed floors and walkways; step up to 5–6 inches wherever a vehicle or heavy equipment will sit. Sections thicker than that usually call for 4000 PSI.
Does a summer pour weaken 3000 PSI concrete?
Not if it's placed right. Florida heat makes concrete set fast, so we book early-morning windows in the hot months and the metered truck lets the crew place, screed and finish before the surface flashes off.