ShortLoad
Free calculator

Equipment & AC Pads concrete calculator

Enter your dimensions — we'll size the load with a 10% waste factor. Typical equipment & ac pads order: ~1 yd³.

Equipment & AC Pads poured with metered small-load concrete in Florida

How much concrete do you need?

Pick your project shape — we'll size the load.

1.75 yd³ includes 10% waste factor · 1 yd³ minimum
Price my project →

Join the priority list

Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.

By submitting, you agree that ShortLoad may text and email you about your quote and availability in your area. Message & data rates may apply; reply STOP to opt out. See our Privacy Policy.

How the math works

length (ft) × width (ft) × thickness (ft) ÷ 27 = cubic yards

  1. 1 Multiply length by width in feet to get the area of the pour.
  2. 2 Convert thickness to feet (4 in = 0.33 ft) and multiply — that gives cubic feet.
  3. 3 Divide by 27 (the cubic feet in one cubic yard) to get cubic yards.
  4. 4 Add 10% waste for uneven ground and spillage, then round up to the quarter yard.

How to use this calculator

  1. 1 Measure the pour. Measure the length and width of the pour in feet, and pick the thickness in inches (4 in is typical).
  2. 2 Enter the dimensions. Type the numbers into the equipment & ac pads calculator — it converts units and divides by 27 to get cubic yards.
  3. 3 Check the waste factor. The result includes 10% waste for uneven ground and spillage, rounded up to the quarter yard (1 yd³ minimum).
  4. 4 Price the delivery. Send the yardage with your ZIP code to get an all-in delivered price — metered trucks bill only what's actually poured.

Typical equipment & ac pads quantities

Common equipment and AC pad sizes — small pours are exactly what metered trucks are for:

Pad sizeThicknessVolumeOrder (with waste)
3 × 3 ft4 in0.11 yd³1 yd³
4 × 4 ft4 in0.20 yd³1 yd³
4 × 6 ft6 in0.44 yd³1 yd³
5 × 8 ft6 in0.74 yd³1 yd³

Below ~1 yd³ the 1-yard minimum applies — combining two or three small pads into one delivery is the usual move.

Common ordering mistakes

Frequently asked questions

How accurate does my estimate need to be?

Close is enough: metered trucks bill the actual yards poured to the nearest quarter yard. The calculator adds a 10% waste factor so you don't come up short.

Which mix should I use for equipment & ac pads?

4000 PSI Structural Mix is the standard recommendation for equipment & ac pads. Higher-strength mix for driveways with heavy loads, footings, equipment pads and structural work.

How thick should an AC or equipment pad be?

4 inches for AC condensers and pool equipment, 5–6 inches for generators and heavier units. Get the pad dead level — installers will reject a sloped one.

Delivered pricing by city

Related calculators & tools

Next step: read the Equipment & AC Pads guide or get your delivered price with the button above.