3000 PSI Standard Mix delivered in Jacksonville, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
With roughly 1,010,000 residents across 22 ZIP codes (32011, 32034, 32046…), Jacksonville is the largest of the 2 Duval County communities we serve.



3000 PSI Standard Mix in Jacksonville — the quick facts
- Price
- typical $150–$220/yd³
- Prices reviewed
- August 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- sandy flatwoods with clay-enriched subsoil (Ultisols) in the uplands
- Best months
- October-June
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical Jacksonville area range: $150–$220/yd³ delivered
A typical 2-yard pour ≈ $300–$440 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in Jacksonville?
Typical Florida pricing for 3000 PSI Standard Mix runs $150–$220/yd³ delivered. We're expanding coverage in Jacksonville — price your project and you're first in line.
When should I schedule a pour in Jacksonville?
Longer pouring season than South Florida, with two caveats: summer storms (Jun-Sep) and occasional Dec-Feb freezes that call for curing blankets on overnight pours.
Which Jacksonville ZIP codes do you deliver to?
We map all 22 Jacksonville ZIP codes, including 32011, 32034 and 32046. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.