3000 PSI Standard Mix delivered in DeBary, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
With roughly 23,000 residents across ZIP codes 32713 and 32736, DeBary is one of 9 Volusia County communities we serve.



3000 PSI Standard Mix in DeBary — the quick facts
- Price
- typical $170–$210/yd³
- Prices reviewed
- August 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- sandy flatwoods with coastal ridge sands near the beaches
- Best months
- October-May
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical DeBary area range: $170–$210/yd³ delivered
A typical 2-yard pour ≈ $340–$420 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in DeBary?
Typical Florida pricing for 3000 PSI Standard Mix runs $170–$210/yd³ delivered. We're expanding coverage in DeBary — price your project and you're first in line.
When should I schedule a pour in DeBary?
Oct-May reliable; occasional winter cold snaps in the county's northwest - check overnight lows Dec-Feb.
Which DeBary ZIP codes do you deliver to?
In DeBary we map ZIP codes 32713 and 32736. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.