3000 PSI Standard Mix delivered in Land O' Lakes, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
Every Land O' Lakes quote is priced to its exact ZIP — ZIP code 34639 — and it's the second-largest of the 19 Pasco County communities we serve, with about 36,000 residents.



3000 PSI Standard Mix in Land O' Lakes — the quick facts
- Price
- typical $150–$180/yd³
- Prices reviewed
- September 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- sandy flatwoods over karst limestone; part of Florida's most sinkhole-active area
- Best months
- October-May
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical Land O' Lakes area range: $150–$180/yd³ delivered
A typical 2-yard pour ≈ $300–$360 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in Land O' Lakes?
Typical Land O' Lakes-area pricing for 3000 PSI Standard Mix runs $150–$180/yd³ delivered. We're expanding coverage in Land O' Lakes — price your project and you're first in line.
When should I schedule a pour in Land O' Lakes?
Oct-May reliable; Jun-Sep afternoon storms favor morning pours.
Which Land O' Lakes ZIP codes do you deliver to?
In Land O' Lakes we map ZIP code 34639. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.
What thickness should a 3000 PSI slab be?
Four inches is standard for patios, shed floors and walkways; step up to 5–6 inches wherever a vehicle or heavy equipment will sit. Sections thicker than that usually call for 4000 PSI.
Does a summer pour weaken 3000 PSI concrete?
Not if it's placed right. Florida heat makes concrete set fast, so we book early-morning windows in the hot months and the metered truck lets the crew place, screed and finish before the surface flashes off.