3000 PSI Standard Mix delivered in Boynton Beach, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
Boynton Beach is one of 14 Palm Beach County communities we serve, home to about 83,000 people across 5 ZIP codes (33426, 33435, 33436…).



3000 PSI Standard Mix in Boynton Beach — the quick facts
- Price
- typical $150–$220/yd³
- Prices reviewed
- August 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- coastal ridge sands and sandy flatwoods; organic muck soils (Histosols) in the western Glades communities
- Best months
- November-May
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical Boynton Beach area range: $150–$220/yd³ delivered
A typical 2-yard pour ≈ $300–$440 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in Boynton Beach?
Typical Florida pricing for 3000 PSI Standard Mix runs $150–$220/yd³ delivered. We're expanding coverage in Boynton Beach — price your project and you're first in line.
When should I schedule a pour in Boynton Beach?
Dry season Nov-May; Jun-Oct daily storm risk favors early-morning pours.
Which Boynton Beach ZIP codes do you deliver to?
In Boynton Beach we map ZIP codes 33426, 33435, 33436, 33437 and 33472. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.