3000 PSI Standard Mix delivered in North Fort Myers, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
North Fort Myers is one of 8 Lee County communities we serve, home to about 43,000 people across ZIP codes 33852, 33903, 33917 and 33982.



3000 PSI Standard Mix in North Fort Myers — the quick facts
- Price
- typical $150–$220/yd³
- Prices reviewed
- August 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- sandy flatwoods (Myakka/Immokalee series) with seasonal high water tables
- Best months
- November-May
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical North Fort Myers area range: $150–$220/yd³ delivered
A typical 2-yard pour ≈ $300–$440 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in North Fort Myers?
Typical Florida pricing for 3000 PSI Standard Mix runs $150–$220/yd³ delivered. We're expanding coverage in North Fort Myers — price your project and you're first in line.
When should I schedule a pour in North Fort Myers?
Dry season Nov-May is the window; Jun-Oct daily storms plus hurricane season - morning pours and covered curing.
Which North Fort Myers ZIP codes do you deliver to?
In North Fort Myers we map ZIP codes 33852, 33903, 33917 and 33982. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.