3000 PSI Standard Mix delivered in Oakland Park, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
With roughly 46,000 residents across ZIP codes 33306, 33308, 33309 and 33334, Oakland Park is one of 23 Broward County communities we serve.



3000 PSI Standard Mix in Oakland Park — the quick facts
- Price
- typical $150–$220/yd³
- Prices reviewed
- August 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- sandy flatwoods soils over limestone, with high water tables toward the coast
- Best months
- November-May
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical Oakland Park area range: $150–$220/yd³ delivered
A typical 2-yard pour ≈ $300–$440 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in Oakland Park?
Typical Florida pricing for 3000 PSI Standard Mix runs $150–$220/yd³ delivered. We're expanding coverage in Oakland Park — price your project and you're first in line.
When should I schedule a pour in Oakland Park?
Dry season Nov-May is the reliable window. Jun-Oct afternoon storms make morning pours the safe default.
Which Oakland Park ZIP codes do you deliver to?
In Oakland Park we map ZIP codes 33306, 33308, 33309 and 33334. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.