3000 PSI Standard Mix delivered in Coral Springs, FL
The workhorse residential mix: shed slabs, patios, sidewalks and driveways in Florida's climate. Poured metered, on-site.
Coral Springs is one of 29 Broward County communities we serve, home to about 140,000 people across ZIP codes 33065 and 33071.



3000 PSI Standard Mix in Coral Springs — the quick facts
- Price
- typical $150–$220/yd³
- Prices reviewed
- September 2026
- Minimum
- 1 yd³ — no short-load fee
- Billing
- metered: pay for actual yards poured
- Local ground
- sandy flatwoods soils over limestone, with high water tables toward the coast
- Best months
- November-May
- Strength (28-day)
- 3,000 PSI
Technical specifications
- 28-day strength
- 3,000 PSI
- Slump
- 4–5 in
- Max aggregate size
- 0.75 in
- Typical uses
- shed slabs, patios, sidewalks, driveway aprons
- Fiber reinforcement
- Available
Typical Coral Springs area range: $150–$220/yd³ delivered
A typical 2-yard pour ≈ $300–$440 delivered, all-in.
We're expanding coverage here. Get your project priced and you're first in line when a local operator comes online.
Price my projectJoin the priority list
Typical pricing by email today — and we’ll text you the moment your area opens. No account needed.
Frequently asked questions
How much does 3000 PSI Standard Mix delivery cost in Coral Springs?
Typical Coral Springs-area pricing for 3000 PSI Standard Mix runs $150–$220/yd³ delivered. We're expanding coverage in Coral Springs — price your project and you're first in line.
When should I schedule a pour in Coral Springs?
Dry season Nov-May is the reliable window. Jun-Oct afternoon storms make morning pours the safe default.
Which Coral Springs ZIP codes do you deliver to?
In Coral Springs we map ZIP codes 33065 and 33071. Pricing is per ZIP — enter yours in the form and it's checked instantly.
Is 3000 PSI enough for a driveway?
For most Florida residential driveways, yes — 3000 PSI with fiber meets code in most counties. For heavy vehicles or thicker sections, consider 4000 PSI.
How long before I can walk on it?
Light foot traffic after 24–48 hours; keep vehicles off for at least 7 days. Full design strength develops at 28 days.
What thickness should a 3000 PSI slab be?
Four inches is standard for patios, shed floors and walkways; step up to 5–6 inches wherever a vehicle or heavy equipment will sit. Sections thicker than that usually call for 4000 PSI.
Does a summer pour weaken 3000 PSI concrete?
Not if it's placed right. Florida heat makes concrete set fast, so we book early-morning windows in the hot months and the metered truck lets the crew place, screed and finish before the surface flashes off.